COWD Plans New River Sources in ₱9.3B–₱12B Water Upgrade
By admin ·
The Cagayan de Oro City Water District is mapping out major upgrades to keep the city’s water service ready for the decade ahead. COWD is eyeing the Bobonawan and Cagayan rivers as additional water sources, part of a broader modernization drive meant to strengthen supply and cut system losses.
According to Chairman Dr. Gerry Cano, a technical working group has completed plans for a proposed ₱5-million water facility that would tap the two rivers. The proposal is now waiting for funding before it can move forward.
The river project sits inside COWD’s 10-year development and modernization program covering 2025 to 2035. The overall package is estimated at ₱9.3 billion to ₱12 billion and focuses on replacing aging pipelines and reducing non-revenue water — the volume lost to leaks, theft and other system losses that never reach paying customers.
Financing options under discussion include tariff adjustments, government funding, loans and possible public-private partnerships. Spreading the cost across several channels is meant to make the multi-year upgrade workable without stalling other service improvements.
Service delivery in hard-to-reach pockets of the city is also on the agenda. COWD plans to deploy small water tankers for communities with narrow roads where larger trucks cannot easily pass. The district currently operates three small tankers that serve areas affected by temporary interruptions.
Cano also urged households to conserve water and reuse what they can at home as the city prepares for drier conditions. Simple habits — fixing leaks promptly, collecting rinse water for plants, and using only what is needed — can ease pressure on the system while infrastructure projects advance.
For a fast-growing city like Cagayan de Oro, investing in new sources and modern pipes is as much about reliability as it is about capacity. Old lines that leak waste both water and money, while additional river intakes can give operators more flexibility when demand rises or when one source needs maintenance.
The ₱5-million facility plan for Bobonawan and Cagayan is a relatively small but strategic piece of the larger ₱9.3-billion to ₱12-billion modernization. Completing the technical plans puts COWD in a stronger position to seek the funds needed to turn drawings into working infrastructure.
Residents who live along narrow barangay roads stand to benefit from the planned small tankers as well. Better mobile delivery options mean fewer households are left waiting when a main line is under repair or when pressure drops in a particular zone.
COWD’s message is clear: the city is investing in stronger water infrastructure for the long term, and households can help by using water wisely every day. Between new river sources, pipeline replacement and smarter delivery to tight streets, the district is laying solid groundwork for more dependable service through 2035.
Source: Daily Tribune (https://tribune.net.ph/2026/10/02/cowd-eyes-two-rivers-as-new-water-sources-amid-el-ni%C3%B1o-threat)
