Tagoloan Cold Storage Plant Plans Expansion, Hearing Dec. 1

By admin ·

VIFEL Ice Plant and Cold Storage is preparing to expand its facility along the National Highway in Tagoloan, Misamis Oriental, a proposal now under environmental review.

The Environmental Management Bureau in Region 10 has issued a notice of public hearing for December 1 on the company’s revised Environmental Performance Report and Management Plan. The existing compound covers 2.1987 hectares and stands at the traffic-light intersection across from the PHIVIDEC Industrial Estate Administration Office and the Mindanao Container Terminal, in Barangay Natumolan.

The expansion is being proposed amid increasing demand for cold storage to handle and preserve perishable goods and to strengthen food safety compliance along the supply chain. If it proceeds, the project could add to the region’s capacity to store and move food products that need refrigeration. The revised Environmental Performance Report and Management Plan now under review covers the existing operation and the proposed addition to the 2.1987-hectare site.

Tagoloan’s location makes the site a practical place for that kind of investment. The town hosts the PHIVIDEC industrial estate and the Mindanao Container Terminal, a major cargo gateway for Northern Mindanao. An ice plant and cold storage warehouse beside that corridor serves businesses that need reliable refrigeration for fish, meat, produce and other perishable cargo heading to local markets or out through the port.

VIFEL already operates its Misamis Oriental branch at that highway address. The December 1 hearing is a formal chance for residents, local officials and other interested parties to review the revised environmental plan and raise questions before any expansion is cleared.

Public hearings of this kind are part of the environmental review process. They allow nearby communities to learn what is being proposed, ask about traffic, noise, wastewater and other possible effects, and put those concerns on the record. The bureau’s decision comes after that process, not before it.

Details such as the cost of the expansion, the added storage capacity and a construction timetable have not been stated in the notice made public this week. Those figures may be discussed during the review or disclosed after the environmental bureau issues a decision.

For now, the announcement is a signal that a cold storage operator in Tagoloan wants to grow with demand, and that the next step is a public hearing, not a groundbreaking. People who live or work near the national highway, the industrial estate and the port will have a set date to be heard.

Traders, fishers and food businesses that already rely on cold storage in the area will also be watching the review, because more capacity, if approved and built, could ease pressure on existing rooms during peak harvest or landing periods. Until then, the plan remains a proposal subject to environmental clearance.